MV BAHAMAS CELEBRATION

Instructed by Resolve Marine Group as Naval Architect for the refloating of the M/V BAHAMAS CELEBRATION in Freeport, Bahamas. The vessel struck the side of the channel on her departure and flooded three adjacent machinery compartments. The vessel returned to the quayside where she was aground at low water and floating with a 14° list at high water. Assisted with the development of a plan to control progressive flooding and dewater all spaces while maintaining adequate stability during the refloat. (Nov 2014)

Scroll to Top